Start with
the site.
A site visit and a 20-page feasibility report give you a basis for deciding whether to pursue hydropower.
See what the report coversInside the feasibility report
The report brings together the site’s hydrology, initial turbine design, estimated costs and the factors that could limit the scheme.

- The watercourse
- Initial hydrology, ecology and the factors that could limit the scheme.
- The installation
- Possible turbine locations and sizes, grid connection, an initial design and a CAD model.
- The economics
- Estimates of power, annual energy, installation and maintenance costs, revenue and return.
Bring us a scheme
at any stage.
Hallidays can deliver the full installation or pick up the work wherever your project stands. Open a stage to see what it covers.
Concept
Identify what the owner wants the scheme to do and where an installation might fit the watercourse.
Feasibility
Visit the site, study the hydrology and test whether a scheme is practical enough to take forward.
Design
Develop the turbine layout and installation design for the conditions on site.
Licensing
Work with the relevant environmental and planning authorities on the permissions the scheme needs.
Installation
Build and install the scheme on site.
Commissioning
Bring the plant into operation and hand it over to the operator.
Maintenance
Support the running scheme with servicing, operator training and remote monitoring.
Operating a Scheme
Technology and financing
- Innovate
- Hallidays develops turbine designs around site conditions and installation costs. Its development projects include the floating ECO-Auger® and Poly-Mod Turbine, a lightweight moulded-plastic screw concept.
- Invest
- Hallidays owns and sells its own schemes and helps others finance, buy or sell projects in the UK and overseas. Its work can include land negotiations, power purchase agreements and scheme financing.