Morden Hall Park
The 8.5 kW Archimedes screw supplies the stable yard visitor centre and Snuff Mill. Hallidays describes it as London’s first hydroelectric turbine.
The shallower drop in this pair has the higher-rated turbine. Head is one part of the site assessment.
Compare the published figuresMorden Hall Park
Dandridge’s Mill
Head is the difference in water levels. Rated power is measured in kW and annual generation in kWh.
| Measure | Morden Hall Park | Dandridge’s Mill |
|---|---|---|
| Head | 1.2 m | 2.4 m |
| Flow | Unpublished | 0.36 m³/s |
| Rated power | 8.5 kW | 5 kW |
| Annual generation | Unpublished | Over 27,000 kWh |
Installed capacity
75 kW230 MWh a year reported
The scheme was reported to supply 92% of Bury Black Pudding Company’s electricity. Surplus generation feeds the grid.
Installed capacity
100 kW281 MWh a year reported
The Archimedes HydroScrew serves Pear Mill, a former cotton-spinning mill now housing commercial units. The fish pass was reported to restore migration across the weir.
Proposed capacity
499 kW2,500 MWh a year projected
The proposal for a disused tidal lock includes two Archimedes screws and separate passes for fish and eels.